University of Mpumalanga
SKCM was appointed by the University of Mpumalanga (UMP) for the design and construction monitoring of the bulk sewer project which included the following:
- Construction of a 3,1MI reservoir on the UMP property north of the existing 0.9 MI Loveld College of Agriculture reservoir;
- Upgrading of the existing steel bridge over the Crocodile River;
- Installation of ± 7 340m pipelines (355mmØ pump line = 3160m; 200mmØ gravity supply line = 2400m; 500mmØ gravity supply line = 380m; 450mmØ gravity supply line = 1400m) ; and
- Connecting supply line to the 0,9MI reservoir.
Project Details
University of Mpumalanga
Bulk Sewer Project












